Skip to main content

202608 Service Upgrade and Retirement of Selected Old Generation GPU Resource Models

Dear Customer,

Thank you for your long-term support and use of TWSC (TWAI Cloud) related services.

With the rapid development of generative AI, Large Language Models (LLM), and AI Agent applications, the market demand for computing power performance, operational efficiency, and service quality continues to increase. To provide a more stable and high-performance AI computing environment, TWSC will continue to optimize its overall GPU resource allocation and gradually upgrade platform service capabilities.

At the same time, because related old-generation GPU equipment will gradually complete their phased retirement and resource updates, TWSC is upgrading platform computing services to provide a computing environment that better meets current AI application needs.

We plan to gradually stop supplying V100 and T4 GPU related services or resource models starting from the end of August 2026. The affected services, resource models, and decommission schedules are as follows:

Affected ServiceLast Date of AvailabilityAlternative Plan / Description
Virtual Compute Service (VCS)
- vgv series (V100) and vgt series (T4)
August 30, 2026Only the vgv series (V100) and vgt series (T4) will be discontinued; other models are unaffected. We recommend switching to the ugv series (H100) and vgah series (A100) , or CPU instance series.
Container Compute Service (CCS)August 30, 2026We recommend adopting GPU VMs combined with Singularity to run containerized workloads.
High Performance Computing (HPC)August 30, 2026Depending on the actual use case, a dedicated contact window will assist in evaluating subsequent handling methods.
Hyper File System (HFS)August 30, 2026Please complete backup and download within the data retention period*; if there are special requirements, a dedicated contact window will assist in evaluation.
OneAIAugust 27, 2026Please complete backup and download before the last date of availability; if there are special requirements, a dedicated contact window will assist in evaluation.
AFS Model SpaceAugust 27, 2026We recommend switching to AFS AI Hub to provide private model inference services. A dedicated contact window will assist in evaluation.
AFS PlatformAugust 27, 2026Depending on the actual use case, a dedicated contact window will assist in evaluating subsequent handling methods.
AFS CloudAugust 27, 2026Depending on the actual use case, a dedicated contact window will assist in evaluating subsequent handling methods.

*Note: After the HFS service stops, existing HFS data will be retained until September 30, 2026. Please complete data backup and download within this period. For data not processed past the deadline, TWSC reserves the right to remove or delete files and data generated by using this service, and clear the usage space in accordance with the terms of service and relevant regulations.

After the last date of availability for the respective services/resource models, the related services and resources will be forcibly terminated or cleared, and will no longer be available. Please arrange in advance to safeguard your rights.

Please complete the following actions before the service decommission date:

  • Confirm the status of the affected resources and services currently in use.
  • Inventory data, images, or execution environments that need to be retained.
  • Plan data backup, downloading, or migration operations.
  • If there is still a resource demand, please evaluate switching to other resource models or contact your business representative.
  • If contracts, limits, or billing issues are involved, please confirm with the relevant contact window in advance.

If you have any questions, please feel free to contact us:

We apologize for any inconvenience caused and thank you for your understanding and cooperation.